December 28, 2022 at 10:52 am
#417151
Jeremy Rowley
Jason, I think there is a problem with your numbers. The main halyard has to go up the mast and back down again and then to the clutches. The mast is 11.5m tall, So that would be 11.5+11.5+2 = 25m – lets say 26m, and the same with all the other halyards for jib, spinnaker. Topping lift I would say 23m if cleated at the mast.
Jeremy Rowley
KOTO – Classic 35.